Metal welding and fabrication
PRECISION MANUFACTURING • CHITWAN FACILITY

PRECISION IN EVERY PROCESS.

Quality isn't an accident. It is engineered into every single metal surface through our rigorous chemical immersion pre-treatment facility.

01 / SUBSTRATE CLEANSING

Total Degreasing & Scale Removal

Alkaline baths strip away rolling lubricants, followed by controlled acid pickling to eliminate surface rust down to the bare molecular iron matrix.

02 / CRYSTALLINE BONDING

Phosphate Conversion Layer

Immersed in a chemical phosphating conversion bath, bare metal grows a micro-crystalline coating that mechanically anchors the powder coat.

03 / CORROSION SEAL

Chemical Passivation

A non-chromic passivation rinse seals microscopic grain boundaries, locking out humidity, sweat, detergents, and hospital sterilizers.

THE 9 STAGES IN DETAIL

From Raw Sheet Metal to Lasting Protection

01

Alkaline Degreasing

Hot Alkaline Surfactant Bath

Strips heavy rolling lubricants, mill oils, cutting grease, and factory dust from raw cold-rolled steel sheets and tubular sections.

Process Parameters55°C – 65°C (Heated) • 6 – 8 MinutespH 11.5 – 12.0 (High Alkaline)
02

Primary Cascade Water Rinse

Deionized Counter-Current Overflow

Flushes away emulsified alkaline residue and detached grease to prevent alkaline carry-over into acid pickling tanks.

Process ParametersAmbient (20°C – 28°C) • 2 – 3 MinutespH 7.0 – 7.5 (Neutral)
03

Inhibited Acid Pickling

Inhibited Acid Etching Solution

Dissolves surface rust blooms, mill scale, and welding oxidation down to the bare molecular iron crystalline matrix.

Process ParametersAmbient (22°C – 30°C) • 8 – 12 MinutespH 1.0 – 1.6 (Strong Acid)
04

Secondary Acid Flush Rinse

Turbulent Fresh Water Flush

Thoroughly flushes away acid solution from corners, internal tubular cavities, and welded joints.

Process ParametersAmbient (20°C – 28°C) • 2 – 3 MinutespH 6.5 – 7.0 (Near Neutral)
05

Chemical Surface Neutralization

Mild Alkaline Conditioning Solution

Neutralizes microscopic traces of acid trapped inside steel pores, preventing flash rust before phosphating.

Process Parameters35°C – 45°C (Warm) • 2 – 4 MinutespH 8.5 – 9.2 (Mild Buffer)
06

Tertiary Low-TDS Rinse

Demineralized High-Purity Water

Guarantees absolute surface cleanliness before entering the catalytic zinc phosphating immersion bath.

Process ParametersAmbient (20°C – 28°C) • 2 – 3 MinutespH 7.0 (Pure Neutral)
07

Zinc Phosphate Conversion

Crystalline Zinc-Iron Phosphate Bath

Grows a non-metallic, micro-crystalline zinc-iron phosphate layer chemically bonded into the virgin metal surface.

Process Parameters50°C – 60°C (Catalytic) • 6 – 8 MinutespH 2.8 – 3.2 (Controlled Acidic)
08

Post-Phosphate Barrier Rinse

Ultra-Pure Deionized Barrier Wash

Removes unreacted phosphate salts and residual reaction by-products before the final nanotech passivation sealant.

Process ParametersAmbient (20°C – 28°C) • 2 – 3 MinutespH 6.8 – 7.2 (Neutral)
09

Chemical Passivation & Sealant

Chromate-Free Nanotech Sealant

Seals microscopic crystal pore boundaries in the phosphate layer, multiplying humidity and rust resistance tenfold.

Process Parameters45°C – 55°C (Active Seal) • 3 – 5 MinutespH 4.0 – 4.8 (Target Barrier)

Manufacturing Durability Standard Comparison

Evaluation MetricOrdinary Untreated Spray PaintingUFI 9-Step Powder Coating
Pre-TreatmentDry rag wipe or single washFull 9-step chemical immersion sequence
Paint AdhesionSurface peel with light scuffingMicro-crystalline phosphate chemical anchor
Humidity & Rust ResistanceRust blooms within 6–12 months in monsoonChemical passivation resists decades of monsoon
Cleanability & HygieneAttacked by disinfectant solventsCompatible with hospital and clinical cleaning protocols

Need Institutional or Bulk Metal Furniture?

Talk directly with our manufacturing engineers in Chitwan to discuss custom dimensions, load ratings, and project lead times.

Request Factory Pricing & Specs