
PRECISION MANUFACTURING • CHITWAN FACILITY
PRECISION IN EVERY PROCESS.
01 / SUBSTRATE CLEANSING
Total Degreasing & Scale Removal
02 / CRYSTALLINE BONDING
Phosphate Conversion Layer
03 / CORROSION SEAL
Chemical Passivation
THE 9 STAGES IN DETAIL
From Raw Sheet Metal to Lasting Protection
01
Alkaline Degreasing
Hot Alkaline Surfactant BathProcess Parameters55°C – 65°C (Heated) • 6 – 8 Minutes
02
Primary Cascade Water Rinse
Deionized Counter-Current OverflowProcess ParametersAmbient (20°C – 28°C) • 2 – 3 Minutes
03
Inhibited Acid Pickling
Inhibited Acid Etching SolutionProcess ParametersAmbient (22°C – 30°C) • 8 – 12 Minutes
04
Secondary Acid Flush Rinse
Turbulent Fresh Water FlushProcess ParametersAmbient (20°C – 28°C) • 2 – 3 Minutes
05
Chemical Surface Neutralization
Mild Alkaline Conditioning SolutionProcess Parameters35°C – 45°C (Warm) • 2 – 4 Minutes
06
Tertiary Low-TDS Rinse
Demineralized High-Purity WaterProcess ParametersAmbient (20°C – 28°C) • 2 – 3 Minutes
07
Zinc Phosphate Conversion
Crystalline Zinc-Iron Phosphate BathProcess Parameters50°C – 60°C (Catalytic) • 6 – 8 Minutes
08
Post-Phosphate Barrier Rinse
Ultra-Pure Deionized Barrier WashProcess ParametersAmbient (20°C – 28°C) • 2 – 3 Minutes
09
Chemical Passivation & Sealant
Chromate-Free Nanotech SealantProcess Parameters45°C – 55°C (Active Seal) • 3 – 5 Minutes
Manufacturing Durability Standard Comparison
| Evaluation Metric | Ordinary Untreated Spray Painting | UFI 9-Step Powder Coating |
|---|---|---|
| Pre-Treatment | Dry rag wipe or single wash | Full 9-step chemical immersion sequence |
| Paint Adhesion | Surface peel with light scuffing | Micro-crystalline phosphate chemical anchor |
| Humidity & Rust Resistance | Rust blooms within 6–12 months in monsoon | Chemical passivation resists decades of monsoon |
| Cleanability & Hygiene | Attacked by disinfectant solvents | Compatible with hospital and clinical cleaning protocols |